These are published by The Concrete Society in CONCRETE. The Society are neither responsible for the opinions nor statements expressed by the authors.
These are free to all members of The Society.
For further magazine articles please try using our Magazine article search
Please login to gain access to the Practice sheets.
Login here
Forgotten your password?
Register
Ref | Title | Datee |
---|---|---|
157/2 | Photocatalytic concrete part 2 | 01/2012 |
157/1 | Photocatalytic concrete part 1 | 12/2011 |
156 | Headed reinforcement bars | 06/2010 |
155 | Precast segmental concrete bridges | 07/2008 |
154 | Sliding bridges and fast construction | 02/2008 |
153 | Balanced cantilever bridges | 11/2007 |
152 | Jacked box underbridges using the Ropkins System | 09/2007 |
151 | Incrementally launched concret bridges | 07/2007 |
150 | Permanent formwork for composite bridge decks | 04/2007 |
149/2 | Admixture current practice - Part 2 | 11/2006 |
149/1 | Admixture current practice - Part 1 | 09/2006 |
148 | Cement Combinations | 05/2006 |
147 | Concrete gantries | 03/2006 |
146 | FLY ASH | 03/2006 |
145 | Self-compacting concrete | 10/2005 |
144 | Controlled Permeability Formwork | 10/2005 |
143 | Bridge deck waterproofing | 04/2005 |
142 | Precast reinforced concrete arch and portal units | 03/2005 |
141 | Strengthing concrete bridges with fibre composites | 06/2004 |
140 | Factory-produced cements | 06/2004 |
139 | Corrosion inhibitors | 06/2004 |
138 | BS 8500:2002 Standardised prescribed concretes | 05/2004 |
137 | Bridge Joints | 03/2004 |
136 | Portland-limestone cement - the UK situation | 03/2004 |
135 | Prestressed concrete bridge beams | 11/2003 |
134 | Achieving quality ‘as struck ‘finishes | 11/2003 |
133 | Measurement of chloride ion concentration of RC | 09/2003 |
132 | Measuring the corrosion rate of RC using LPR | 03/2003 |
131 | Measuring depth of carbonation | 01/2003 |
130 | Integral bridges | 11/2002 |
129 | Cold-weather concreting | 09/2002 |
128 | Measuring concrete resistivity to assess corrosion rate | 02/2002 |
127 | Bridge durability | 01/2002 |
126 | Concrete Footbridges | 11/2001 |
125 | Surface blemishes on power-trowelled concrete floors due to aggregate particles at the surface | 09/2001 |
124 | Concrete surfaces for painting | 07/2001 |
123 | Self-compacting concrete - Part I: The material and its properties | 07/2001 |
122 | Specification and use of admixtures for concrete for industrial floors | 09/2000 |
121 | Bonded versus unbonded cement-sand screeds | 09/2000 |
120 | Half cell potential surveys of reinforced concrete structures | 07/2000 |
119 | Use of expanding (hydraulic) waterstops in concrete construction | 02/2000 |
118 | High-strength concrete | 06/1999 |
117 | Controlled permeability formwork | 05/1999 |
116 | Pulverised-fuel ash. Part 1 Origin and properties | 04/1999 |
115 | Concreting diaphragm walls | 02/1999 |
114 | Fibre-reinforced plastic reinforcement for concrete | 01/1999 |
113 | Pigments for concrete and mortar | 10/1998 |
112 | Curing concrete | 08/1998 |
111 | Ferrocement | 05/1986 |
110 | Microsilica concrete - Part 2: In use | 03/1986 |
109 | Slipforming - Part 2 | 02/1986 |
108 | Slipforming - Part 1 | 01/1986 |
107 | Prestressed concrete footbridges | 01/1986 |
106 | Punching | 12/1985 |
104 | Microsilica concrete. Part 1: The material | 10/1985 |
103 | Special reinforcing steels | 09/1985 |
102 | Waterproofing admixtures for concrete | 08/1985 |
101 | Portland cements | 05/1985 |
100 | Refractory concrete | 04/1985 |
99 | Pigments for concrete and mortar | 03/1985 |
98 | Glassfibre reinforced cement permanent formwork | 02/1985 |
97 | Concrete structures for hazard protection | 07/1984 |
96 | Composite concrete-steel deck floors | 06/1984 |
95 | Superplasticised concrete: part 2 | 05/1984 |
94 | Superplasticised concrete: part 1 | 04/1984 |
93 | Fibre reinforced cement and concrete Part 2 Practical composites | 03/1984 |
92 | Fibre reinforded cement and concrete Part 1 Theoretical principles | 02/1984 |
91 | High density concrete Part 2 | 01/1984 |
90 | High density concrete Part 1 | 12/1983 |
89 | Joining of reinforement | 11/1983 |
88 | None-destructive testing: Part 2 | 10/1983 |
87 | Steel reinforcement accessories | 09/1983 |
86 | None-destructive testing: Part 1 | 08/1983 |
85 | Concrete in shafts and tunnels: Part 2 | 07/1983 |
84 | Concrete in shafts and tunnels: Part 1 | 06/1983 |
83 | Precast concrete housefloors | 03/1983 |
82 | Partial prestressing | 02/1983 |
81 | Air entrainment - Part 2 | 01/1983 |
80 | Air entrainment - Part 1 | 12/1982 |
79 | Concrete pumping | 11/1982 |
78 | Fixings in concrete | 10/1982 |
77 | No-fines concrete | 08/1982 |
76 | Pulverised-fuel ash - Part 4 Notes for engineering guidance | 07/1982 |
75 | Pulverised-fuel ash - Part 3 Notes for engineering guidance | 06/1982 |
74 | Concrete viaducts cast on launching girders | 05/1982 |
73 | Floor screeds | 03/1982 |
72/2 | Wood chipboard as a structural lining for formwork - Part 2 | 02/1982 |
72/1 | Wood chipping as a structural lining for formwork - Part 1 | 01/1982 |
71 | BS 5328: 1981 methods for specifying concrete, including ready-mixed concrete - Part 2 | 12/1981 |
70 | BS 5328: 1981 methods for specifying concrete, including ready-mixed concrete - Part 1 | 11/1981 |
69 | Diagnosing the causes and defects or deterioration in concrete structures | 10/1981 |
68 | Sprayed concrete - Part 2 | 09/1981 |
67 | Sprayed concrete - Part 1 | 08/1981 |
66 | Dry lean concrete for minor works | 07/1981 |
65 | Special steel formwork and precst moulds | 06/1981 |
64 | Steel reinforcement production and practice | 05/1981 |
63 | Fabric reinforcement | 04/1981 |
62 | Placing and compacting concrete - Part 2 | 03/1981 |
61 | Placing and compacting concrete - Part 1 | 02/1981 |
60 | Plant hire considerations in concrete treatment | 01/1981 |
59 | Glass reinforced cement | 12/1980 |
58 | Post-tensioned flat slab floors | 11/1980 |
57 | Pulverised fuel ash - Part 2 | 10/1980 |
56 | Incremental launching of concrete bridges - Part 2 | 09/1980 |
55 | Incremental launching of concrete bridges - Part 1 | 08/1980 |
54 | Pulverised fuel ash - Part 1 | 07/1980 |
53 | Concrete and cryogenics - Part 2 | 06/1980 |
52 | Concrete and cryogenics - Part 1 | 05/1980 |
51 | Chloride-free accelerators | 04/1980 |
50 | The deterioration and repair of concrete structures - Part 2 | 03/1980 |
49 | The deterioration and repair of concrete - Part 1 | 02/1980 |
48 | Fire resistance of reinforced concrete | 01/1980 |
47 | Architechtural design and manufacture of precast concrete cladding | 12/1979 |
46 | Structural design of cladding panels | 11/1979 |
45 | Fixing precast concrete cladding | 10/1979 |
44 | Grouting in prestressing | 09/1979 |
43/4 | Prestressing: Part 4 - Stressing | 08/1979 |
43/3 | Prestressing: Part 3 - Loss of prestress | 07/1979 |
43/2 | Prestressing: Part 2 - Anchorages and end blocks | 06/1979 |
43/1 | Prestressing: Part 1 - Tendons and ducts, Materials,handling and installation | 05/1979 |
42 | Steel bar reinforcement | 04/1979 |
41/3 | Painting of concrete: Part 3 - Preperation of surfaces | 02/1979 |
41/2 | Painting of concrete: Part 2 - Substrates and types of coating | 01/1979 |
41/1 | Painting of concrete: Part 1 - General guide | 12/1978 |
40 | Modulus of elasticity and creep simplified prediction and method | 11/1978 |
39 | Plastic cracking | 07/1978 |
38 | Grouting of tall vertical prestressed ducts | 05/1978 |
37 | Chemical resistance of concrete | 05/1977 |
36 | Large pours - 3 continuous casting | 02/1977 |
35 | Large pours - 2 heat generation and control | 12/1976 |
34 | Accelerated strength testing | 10/1976 |
33 | Superplasticised concrete | 09/1976 |
32 | Portland cements | 07/1976 |
31 | Cracking: design and detailing considerations | 06/1976 |
30 | Creep: Part 2 | 05/1976 |
29 | Creep: Part 1 | 04/1976 |
28 | Large pours for reinforced concrete structures | 03/1976 |
27 | Weathering: design of concrete buildings | 11/1975 |
26 | Artificial aggregates for concrete | 09/1975 |
25 | Natural aggregates for concrete | 08/1975 |
24 | Autoclaved aerated concrete | 06/1975 |
23 | Weathering - appearance of concrete structures | 05/1975 |
22 | Weathering - cleaning and restoration of concrete structures | 04/1975 |
21 | Wet analysis | 03/1975 |
20 | Fire reinforced concrete | 01/1975 |
19 | Cement-stabilized materials | 10/1974 |
18 | Lightweight aggregate concrete: Part 3 | 09/1974 |
17 | Lightweight aggregate concrete: Part 2 | 08/1974 |
16 | Lightweight aggregate concrete: Part 1 | 07/1974 |
15 | Transporting fresh concrete: Part 2 | 06/1974 |
14 | Fatigue in concrete | 05/1974 |
13 | Transporting fresh concrete: Part 1 | 03/1974 |
12 | Admixtures | 02/1974 |
11 | Cement grouting | 01/1974 |
10 | Estimating strength fo concrete in structures | 11/1973 |
9 | Ready-mixed concrete | 10/1973 |
8 | Design philosophy and basic assumptions | 08/1973 |
7 | Steel reinforcement produstion and practice | 06/1973 |
6 | Early thermal movement and cracking of concrete | 05/1973 |
5 | Fibres in cement and concrete | 04/1973 |
4 | Fabric reinforcement | 03/1973 |
3 | Steel bar reinforcement | 01/1973 |
2 | Guniting | 12/1972 |
1 | Thermal movement of concrete | 11/1972 |