157/2
|
Photocatalytic concrete part 2
|
01/2012
|
157/1
|
Photocatalytic concrete part 1
|
12/2011
|
156
|
Headed reinforcement bars
|
06/2010
|
155
|
Precast segmental concrete bridges
|
07/2008
|
154
|
Sliding bridges and fast construction
|
02/2008
|
153
|
Balanced cantilever bridges
|
11/2007
|
152
|
Jacked box underbridges using the Ropkins System
|
09/2007
|
151
|
Incrementally launched concret bridges
|
07/2007
|
150
|
Permanent formwork for composite bridge decks
|
04/2007
|
149/2
|
Admixture current practice - Part 2
|
11/2006
|
149/1
|
Admixture current practice - Part 1
|
09/2006
|
148
|
Cement Combinations
|
05/2006
|
147
|
Concrete gantries
|
03/2006
|
146
|
FLY ASH
|
03/2006
|
145
|
Self-compacting concrete
|
10/2005
|
144
|
Controlled Permeability Formwork
|
10/2005
|
143
|
Bridge deck waterproofing
|
04/2005
|
142
|
Precast reinforced concrete arch and portal units
|
03/2005
|
141
|
Strengthing concrete bridges with fibre composites
|
06/2004
|
140
|
Factory-produced cements
|
06/2004
|
139
|
Corrosion inhibitors
|
06/2004
|
138
|
BS 8500:2002 Standardised prescribed concretes
|
05/2004
|
137
|
Bridge Joints
|
03/2004
|
136
|
Portland-limestone cement - the UK situation
|
03/2004
|
135
|
Prestressed concrete bridge beams
|
11/2003
|
134
|
Achieving quality �as struck �finishes
|
11/2003
|
133
|
Measurement of chloride ion concentration of RC
|
09/2003
|
132
|
Measuring the corrosion rate of RC using LPR
|
03/2003
|
131
|
Measuring depth of carbonation
|
01/2003
|
130
|
Integral bridges
|
11/2002
|
129
|
Cold-weather concreting
|
09/2002
|
128
|
Measuring concrete resistivity to assess corrosion rate
|
02/2002
|
127
|
Bridge durability
|
01/2002
|
126
|
Concrete Footbridges
|
11/2001
|
125
|
Surface blemishes on power-trowelled concrete floors due to aggregate particles at the surface
|
09/2001
|
124
|
Concrete surfaces for painting
|
07/2001
|
123
|
Self-compacting concrete - Part I: The material and its properties
|
07/2001
|
122
|
Specification and use of admixtures for concrete for industrial floors
|
09/2000
|
121
|
Bonded versus unbonded cement-sand screeds
|
09/2000
|
120
|
Half cell potential surveys of reinforced concrete structures
|
07/2000
|
119
|
Use of expanding (hydraulic) waterstops in concrete construction
|
02/2000
|
118
|
High-strength concrete
|
06/1999
|
117
|
Controlled permeability formwork
|
05/1999
|
116
|
Pulverised-fuel ash. Part 1 Origin and properties
|
04/1999
|
115
|
Concreting diaphragm walls
|
02/1999
|
114
|
Fibre-reinforced plastic reinforcement for concrete
|
01/1999
|
113
|
Pigments for concrete and mortar
|
10/1998
|
112
|
Curing concrete
|
08/1998
|
111
|
Ferrocement
|
05/1986
|
110
|
Microsilica concrete - Part 2: In use
|
03/1986
|
109
|
Slipforming - Part 2
|
02/1986
|
108
|
Slipforming - Part 1
|
01/1986
|
107
|
Prestressed concrete footbridges
|
01/1986
|
106
|
Punching
|
12/1985
|
104
|
Microsilica concrete. Part 1: The material
|
10/1985
|
103
|
Special reinforcing steels
|
09/1985
|
102
|
Waterproofing admixtures for concrete
|
08/1985
|
101
|
Portland cements
|
05/1985
|
100
|
Refractory concrete
|
04/1985
|
99
|
Pigments for concrete and mortar
|
03/1985
|
98
|
Glassfibre reinforced cement permanent formwork
|
02/1985
|
97
|
Concrete structures for hazard protection
|
07/1984
|
96
|
Composite concrete-steel deck floors
|
06/1984
|
95
|
Superplasticised concrete: part 2
|
05/1984
|
94
|
Superplasticised concrete: part 1
|
04/1984
|
93
|
Fibre reinforced cement and concrete Part 2 Practical composites
|
03/1984
|
92
|
Fibre reinforded cement and concrete Part 1 Theoretical principles
|
02/1984
|
91
|
High density concrete Part 2
|
01/1984
|
90
|
High density concrete Part 1
|
12/1983
|
89
|
Joining of reinforement
|
11/1983
|
88
|
None-destructive testing: Part 2
|
10/1983
|
87
|
Steel reinforcement accessories
|
09/1983
|
86
|
None-destructive testing: Part 1
|
08/1983
|
85
|
Concrete in shafts and tunnels: Part 2
|
07/1983
|
84
|
Concrete in shafts and tunnels: Part 1
|
06/1983
|
83
|
Precast concrete housefloors
|
03/1983
|
82
|
Partial prestressing
|
02/1983
|
81
|
Air entrainment - Part 2
|
01/1983
|
80
|
Air entrainment - Part 1
|
12/1982
|
79
|
Concrete pumping
|
11/1982
|
78
|
Fixings in concrete
|
10/1982
|
77
|
No-fines concrete
|
08/1982
|
76
|
Pulverised-fuel ash - Part 4 Notes for engineering guidance
|
07/1982
|
75
|
Pulverised-fuel ash - Part 3 Notes for engineering guidance
|
06/1982
|
74
|
Concrete viaducts cast on launching girders
|
05/1982
|
73
|
Floor screeds
|
03/1982
|
72/2
|
Wood chipboard as a structural lining for formwork - Part 2
|
02/1982
|
72/1
|
Wood chipping as a structural lining for formwork - Part 1
|
01/1982
|
71
|
BS 5328: 1981 methods for specifying concrete, including ready-mixed concrete - Part 2
|
12/1981
|
70
|
BS 5328: 1981 methods for specifying concrete, including ready-mixed concrete - Part 1
|
11/1981
|
69
|
Diagnosing the causes and defects or deterioration in concrete structures
|
10/1981
|
68
|
Sprayed concrete - Part 2
|
09/1981
|
67
|
Sprayed concrete - Part 1
|
08/1981
|
66
|
Dry lean concrete for minor works
|
07/1981
|
65
|
Special steel formwork and precst moulds
|
06/1981
|
64
|
Steel reinforcement production and practice
|
05/1981
|
63
|
Fabric reinforcement
|
04/1981
|
62
|
Placing and compacting concrete - Part 2
|
03/1981
|
61
|
Placing and compacting concrete - Part 1
|
02/1981
|
60
|
Plant hire considerations in concrete treatment
|
01/1981
|
59
|
Glass reinforced cement
|
12/1980
|
58
|
Post-tensioned flat slab floors
|
11/1980
|
57
|
Pulverised fuel ash - Part 2
|
10/1980
|
56
|
Incremental launching of concrete bridges - Part 2
|
09/1980
|
55
|
Incremental launching of concrete bridges - Part 1
|
08/1980
|
54
|
Pulverised fuel ash - Part 1
|
07/1980
|
53
|
Concrete and cryogenics - Part 2
|
06/1980
|
52
|
Concrete and cryogenics - Part 1
|
05/1980
|
51
|
Chloride-free accelerators
|
04/1980
|
50
|
The deterioration and repair of concrete structures - Part 2
|
03/1980
|
49
|
The deterioration and repair of concrete - Part 1
|
02/1980
|
48
|
Fire resistance of reinforced concrete
|
01/1980
|
47
|
Architechtural design and manufacture of precast concrete cladding
|
12/1979
|
46
|
Structural design of cladding panels
|
11/1979
|
45
|
Fixing precast concrete cladding
|
10/1979
|
44
|
Grouting in prestressing
|
09/1979
|
43/4
|
Prestressing: Part 4 - Stressing
|
08/1979
|
43/3
|
Prestressing: Part 3 - Loss of prestress
|
07/1979
|
43/2
|
Prestressing: Part 2 - Anchorages and end blocks
|
06/1979
|
43/1
|
Prestressing: Part 1 - Tendons and ducts, Materials,handling and installation
|
05/1979
|
42
|
Steel bar reinforcement
|
04/1979
|
41/3
|
Painting of concrete: Part 3 - Preperation of surfaces
|
02/1979
|
41/2
|
Painting of concrete: Part 2 - Substrates and types of coating
|
01/1979
|
41/1
|
Painting of concrete: Part 1 - General guide
|
12/1978
|
40
|
Modulus of elasticity and creep simplified prediction and method
|
11/1978
|
39
|
Plastic cracking
|
07/1978
|
38
|
Grouting of tall vertical prestressed ducts
|
05/1978
|
37
|
Chemical resistance of concrete
|
05/1977
|
36
|
Large pours - 3 continuous casting
|
02/1977
|
35
|
Large pours - 2 heat generation and control
|
12/1976
|
34
|
Accelerated strength testing
|
10/1976
|
33
|
Superplasticised concrete
|
09/1976
|
32
|
Portland cements
|
07/1976
|
31
|
Cracking: design and detailing considerations
|
06/1976
|
30
|
Creep: Part 2
|
05/1976
|
29
|
Creep: Part 1
|
04/1976
|
28
|
Large pours for reinforced concrete structures
|
03/1976
|
27
|
Weathering: design of concrete buildings
|
11/1975
|
26
|
Artificial aggregates for concrete
|
09/1975
|
25
|
Natural aggregates for concrete
|
08/1975
|
24
|
Autoclaved aerated concrete
|
06/1975
|
23
|
Weathering - appearance of concrete structures
|
05/1975
|
22
|
Weathering - cleaning and restoration of concrete structures
|
04/1975
|
21
|
Wet analysis
|
03/1975
|
20
|
Fire reinforced concrete
|
01/1975
|
19
|
Cement-stabilized materials
|
10/1974
|
18
|
Lightweight aggregate concrete: Part 3
|
09/1974
|
17
|
Lightweight aggregate concrete: Part 2
|
08/1974
|
16
|
Lightweight aggregate concrete: Part 1
|
07/1974
|
15
|
Transporting fresh concrete: Part 2
|
06/1974
|
14
|
Fatigue in concrete
|
05/1974
|
13
|
Transporting fresh concrete: Part 1
|
03/1974
|
12
|
Admixtures
|
02/1974
|
11
|
Cement grouting
|
01/1974
|
10
|
Estimating strength fo concrete in structures
|
11/1973
|
9
|
Ready-mixed concrete
|
10/1973
|
8
|
Design philosophy and basic assumptions
|
08/1973
|
7
|
Steel reinforcement produstion and practice
|
06/1973
|
6
|
Early thermal movement and cracking of concrete
|
05/1973
|
5
|
Fibres in cement and concrete
|
04/1973
|
4
|
Fabric reinforcement
|
03/1973
|
3
|
Steel bar reinforcement
|
01/1973
|
2
|
Guniting
|
12/1972
|
1
|
Thermal movement of concrete
|
11/1972
|